England & Scotland Glasgow · Aberdeen · Fareham
Bricklayers setting out blockwork against insulation boards inside the steel frame at Kintore

Substation Civil Works

Civil works and grid infrastructure packages on 132kV to 400kV substations across England and Scotland.

Substation packages, self-delivered from groundworks to fit-out

Across England and Scotland, PKBC is the subcontractor main contractors and energy developers turn to for civils, fit-out and firestopping packages on transmission substations, with HV electrical installation by others.

One subcontract covers self-delivered trades from groundworks to internal fit-out, so your site team manages fewer interfaces. Utility prequalification is already in place: PKBC is registered on Achilles UVDB, the utilities industry's supplier qualification system, at Silver Plus. For the full turnkey civils scope, see Civil Works & Substations.

  • One subcontract from earthworks to handover
  • Self-delivered trades, fewer interfaces for your site team
  • Achilles UVDB Silver Plus, Constructionline Gold, SSIP and ISO 9001
Operatives building blockwork walls inside a steel-framed substation building
Packages

Grid infrastructure packages, priced to suit your procurement

Take the packages together or as standalone elements, with HV electrical installation by others.

Civils package

Earthworks, foundations and bases, and cable trenches. See the full turnkey scope on Civil Works & Substations, and the cable route scope on Cable Pulling & Ducting.

Internal fit-out package

Blockwork, drylining and joinery, ceilings, kitchens and fire doors with ironmongery. Delivered at Kintore and Beauly.

Firestopping and fireproofing package

Tested systems closing out compartmentation. Delivered at Gretna and Kintore.

Painting and floor coatings

Anti-slip floor painting at Thurso and Beauly, and acid-resistant painting at the Kintore 400kV substation.

Repairs and additional works on live substations

Working inside operational assets under the client's permit systems, at the existing Beauly building and Lochay 132kV substation.

System scaffold and access

System scaffold installation and access for internal fit-out trades. Delivered at Kintore Phase 3.

Transmission substations for SSEN

Kintore 132kV Substation Phase 3, Aberdeenshire

Client
SSEN
Location
Kintore, Aberdeenshire

On Phase 3 of the Kintore substation we delivered all internal fit-out works: system scaffold, blockwork, drylining and joinery, timber and suspended grid ceilings, a kitchen, fire doors with ironmongery, painting, spraying and taping, and firestopping and fireproofing. An earlier package at the Kintore 400kV Substation Phase 2 covered similar fit-out, including acid-resistant painting.

Blocklaying from scaffold towers inside a steel-framed substation building at Kintore

Beauly 132kV and 400/275/132kV Substations, Highland

Client
SSEN
Location
Beauly, Highland

With BAM Nuttall, PKBC delivered the full internal fit-out of the 400/275/132kV substation: blockwork, drylining and joinery, timber suspended ceilings and kitchen, fire doors with ironmongery, painting including anti-slip floor painting, and firestopping and fireproofing works.

PKBC also returned to the existing 132kV building with Global Infrastructure for repair works, including stripping and replacing the reveals to the external steel fire doors, together with painting works.

Steel fire door installed in the existing substation building at Beauly

Grid stability plants for Welsh Power

Thurso Synchronous Condenser, 400kV Substation, Caithness

Client
Welsh Power
Main contractor
RJ McLeod
Location
Thurso, Caithness

At the Thurso synchronous condenser substation PKBC carried out additional works packages, including the application of anti-slip floor paint to all floors of the facility.

Floor coating works at the Thurso synchronous condenser substation

Gretna Grid Stability Plant, 275kV Substation, Dumfries and Galloway

Client
Welsh Power
Main contractor
TSK and RJ McLeod
Location
Gretna, Dumfries and Galloway

At the Gretna grid stability plant on the border, PKBC carried out final grouting of the external fire wall, together with firestopping and fireproofing works.

Fire-stopped and labelled cable penetrations in a cable trench at Gretna
400kVSubstation projects up to 400kV
24Project sites across the UK
9Trades under one subcontract
3Offices in England & Scotland

Also delivered on the grid

From Suffolk and the West Midlands to Shetland, PKBC packages sit on transmission and grid stability infrastructure across England and Scotland.

Gremista GSP 132kV Substation, Shetland

SSEN, with Morgan Sindall.

Eye 400kV Synchronous Condenser, Suffolk

Conrad Energy, with ACS and Siemens Energy.

Kelvin ERF Substation, West Bromwich

With Acciona.

Beatrice 400/220kV Substation, Blackhillock

With RJ McLeod.

Lochay 132kV Live Substation Renovation

With Global Infrastructure.

All recent projects Projects map

Have a package to price?

Send us your scope and drawings. We price civil works and specialist packages across England and Scotland.

Discuss a project