Older Projects

Selected earlier projects that built the track record behind our current work.

Project archive

Substation fit-out, delivered and handed over

A selection of earlier packages, most of them internal fit-out on transmission substations for tier-1 contractors. This is the work that built the systems and crews we bring to energy projects across England and Scotland today.

Operatives building blockwork walls inside a steel-framed substation building
SSEN · with BAM Nuttall

Beauly 400/275/132kV Substation

Full internal fit-out: blockwork, drylining and joinery, timber suspended ceilings and kitchen, fire doors with ironmongery, painting, spraying and taping including anti-slip floor painting, and firestopping and fireproofing works.

PKBC bricklayers setting out blockwork against insulation boards inside the steel frame at Kintore
SSEN · with Farrans

Kintore 400kV Substation (Phase 2)

Full internal fit-out: system scaffold installation, brickwork and blockwork, joinery, timber and suspended grid ceilings and kitchen, fire doors with ironmongery, painting, spraying and taping including acid-resistant painting, and firestopping and fireproofing works.

Operatives fitting grating covers over cable troughs at a substation
SSEN · with BAM Nuttall

New Deer 400/275kV Substation (Moray East)

We managed the internal fit-out: drylining and joinery, earthing steel mesh installation, painting, spraying and taping, firestopping and fireproofing works, and fitting of external GRP panels.

Operatives building a timber stud wall with a boom lift inside the Alyth substation building
SSEN · with BAM Nuttall

Alyth 275kV Substation

Full internal fit-out: blockwork, drylining and joinery, timber suspended ceilings and kitchen, earthing steel mesh installation, fire doors with ironmongery, painting, spraying and taping including acid-resistant painting, and firestopping and fireproofing works.

PKBC operatives cutting boards at a bench during internal fit-out
SSEN · with BAM Nuttall

Shetland 132kV Substation (Kergord & Viking HVDC)

Internal fit-out for the Shetland substation, including drylining and joinery works.

Operative spray painting blockwork walls white inside a substation building
SSEN · with BAM Nuttall

Kinardochy Substation

Full internal fit-out: blockwork, drylining and joinery, timber suspended ceilings and kitchen, earthing steel mesh installation, steel fire doors with ironmongery, painting, spraying and taping including acid-resistant painting, and firestopping and fireproofing works.

Operatives jointing drylining beneath a fire-rated plasterboard ceiling at Rothienorman
Welsh Power · with RJ McLeod

Rothienorman Substation

Full internal fit-out: blockwork, drylining and joinery, fire doors with ironmongery, painting and taping including anti-slip and acid-resistant painting, and firestopping and fireproofing works.

Three PKBC operatives laying flooring in a refurbished office room
with BAM Nuttall

Welfare and Office at Willowdale Place

Renovation of an old building for use as a welfare and office during the works at Willowdale GSP Substation: demolition, drylining and joinery, suspended grid ceilings and kitchen, plumbing and electrical works, painting and taping, floor laying and a fire risk assessment.

Glen Garioch Distillery

For Beam Suntory, with Luddon Construction.

We carried out the full internal fit-out for the new office within the old distillery building, including:

  • Demolition works
  • Groundworks
  • Drylining and joinery, suspended grid ceilings and kitchen
  • Plumbing
  • Fire door installation
  • Painting and taping, including hygienic floor painting
  • Diamond core drilling
New timber stud partitions and insulation inside the old distillery building

Ardmore Distillery

For Suntory Global Spirits, with Luddon Construction.

A specialist package: diamond core drilling works at the Ardmore Distillery.

PKBC operative diamond core drilling a block wall at Ardmore Distillery

Community and commercial works

Operative replacing an upstairs window from a scaffold tower on a granite terraced house
Peterhead Council · with Kier Group

Windows Replacement Project (HIP)

Window replacement in Peterhead as part of the Home Improvement Programme (HIP): a large number of windows replaced, with finishing around every window internally and externally.

Barriered work area at the Morrison supermarket site in Aberdeen
Wm Morrison Supermarkets · with HB Projects

Morrison Repairs

Repair works for the Morrison supermarket in Aberdeen for our client HB Projects, including external render repairs.