Energy & Renewables
Our core market: transmission substations from 132kV to 400kV, synchronous condensers and grid stability plants, HVDC-linked sites and energy-from-waste facilities — civil works on the renewables projects supporting the UK's journey to net zero.
Built for live and remote energy environments
Energy sites test a contractor: remote locations, live compounds, strict permit regimes and programmes driven by outage windows. Our crews deliver under energy-sector site rules, and travel and lodge wherever the grid needs building.
- Concrete foundations and equipment bases
- Control and switchgear buildings in blockwork and precast
- Cable trenches, troughs and ducting
- Internal fit-out: drylining, joinery, painting and firestopping
- Fencing and external works through to handover
Where we have delivered
A selection of substation and grid stability projects. See where we have worked on the interactive map.
Gremista GSP 132kV, Shetland
Internal fit-out packages on the grid supply point serving the Shetland HVDC link, for SSEN with Morgan Sindall.
Thurso Synchronous Condenser, 400kV
Grid stability project delivered with RJ McLeod.
Gretna Grid Stability Plant, 275kV
Blockwork, fireproofing and firestopping on the border grid stability plant, with TSK and RJ McLeod.
Eye Synchronous Condenser, 400kV, Suffolk
Construction packages on a grid stability facility for Conrad Energy, with ACS and Siemens Energy.
Kelvin ERF Substation, West Bromwich
Substation works on a 44MW energy-from-waste facility, with Acciona.
Beatrice 400/220kV, Blackhillock
Substation works delivered with RJ McLeod.
Industrial & Distilleries
Building and fit-out packages for industrial projects: production and process facilities where finishes have to stand up to daily industrial use.
Production-ready buildings and finishes
We deliver the trades industrial clients ask for most: robust masonry, clean internal finishes and floors that cope with process environments. At Glenglassaugh Distillery we delivered our packages for Luddon Construction.
- Blockwork and brickwork for production halls and plant rooms
- Drylining, ceilings and painting
- Chemical resistant floor systems for process areas
- Firestopping and passive fire protection
- First and second fix joinery
Commercial
Fit-out and construction packages for retail stores, hotels and commercial interiors across England and Scotland, handed over snag-free and ready to trade.
- Store refurbishment and fit-out packages
- Partitions, ceilings, joinery and decoration
- Floor coverings and finishes
- External works and paving








