PKBC Ltd
PKBC Ltd
  • Home
  • Services
    • Consultancy Services
    • Project Management
    • Bricklaying
    • Drylining
    • Joinery
    • Painting
    • Scaffolding
    • Firestopping
    • Chemical Resistant Floors
  • Gallery
  • Projects
    • Recent projects
    • Older projects
    • Projects Map
  • Vacancies
  • Contact Us
  • More
    • Home
    • Services
      • Consultancy Services
      • Project Management
      • Bricklaying
      • Drylining
      • Joinery
      • Painting
      • Scaffolding
      • Firestopping
      • Chemical Resistant Floors
    • Gallery
    • Projects
      • Recent projects
      • Older projects
      • Projects Map
    • Vacancies
    • Contact Us
  • Home
  • Services
    • Consultancy Services
    • Project Management
    • Bricklaying
    • Drylining
    • Joinery
    • Painting
    • Scaffolding
    • Firestopping
    • Chemical Resistant Floors
  • Gallery
  • Projects
    • Recent projects
    • Older projects
    • Projects Map
  • Vacancies
  • Contact Us
SSEN - Morgan Sindall

Gremista Grid Supply Point (gsp) 132kv substation (shetland)

We carried out all Internal Fitout works at Gremista Substation at Shetland, incl:

- System Scaffold installation

- Blockworks

- Drylining/Joinery, Timber and suspended grid ceilings, Kitchen

- Fire Doors installation (incl. ironmongery), 

- Painting/Spraying/Taping (incl. acid-resistant & anti-slip painting)

- etc.

Welsh Power - RJ McLeod

Thurso Synchronous Condenser / Transmission 400kv Substation

Additional works at Thurso Synchronous Condenser Substation

- application of anti-slip floor paint to all floors

- additional works

- etc.

Gretna Substation Firestopping and Fireproofing works by PKBC
Welsh Power - TSK/RJ McLeod

Gretna Grid stability plant/ 275kV Substation

We carried out requested works at Gretna GSP Substation, including:

- final grouting of external Fire wall

- Firestopping & Fireproofing

- etc.

Kintore Substation Internal FitOut, Blockwork, Drylining, Joinery, Painting, Firestopping by PKBC
SSEN - OMEXOM

Kintore 132kv Substation (Phase 3)

We carried out all Internal Fitout works at Phase 3 of Kintore Substation, incl:

- System Scaffold installation

- Blockworks

- Drylining/Joinery, Timber and suspended grid ceilings, Kitchen

- Fire Doors installation (incl. ironmongery), 

- Painting/Spraying/Taping

- Firestopping & Fireproofing

- etc.

Biohacking Studio full Internal fitout, Drylining, Joinery, painting, flooring works by PKBC
Private Client

Biohacking Studio (Switzerland)

We carried out all internal fit-out at overseas  project (Biohacking Studio) in Switzerland. Works been carried :

- Drylining/Joinery

- Kitchen and furniture installation

- Doors installation

- Painting/Spraying/Taping

- Flooring

- etc.

Eye Syn Con Substation Internal fitout, installation of Fire doors and Painting works by PKBC
Conrad Energy - ACS / Siemens Energy

Eye synchronous condenser Grid Stability Facility 400KV

We carried out an additional works at Eye Syn Con Substation , including:

- supply and installation of Fire doors

- painting works

- additional works

- etc. 

Lochay Substation Internal fitout, renovation and refurbishment, Joinery and Painting works by PKBC
SSEN - Global Infrastructure

LOCHAY 132KV LIVE SUBSTATION (renovation of old BUILDING)

We carried out renovation works at old LIVE Lochay Substation incl:

- demolition works

- stripping and replacement of old high timber ceiling

- Painting/Taping (incl. acid-resistant painting)

- Fire Doors design and installation (incl. ironmongery)

- etc.

Lochay Substation Internal fitout, Joinery and Painting Spraying works by PKBC
SSEN - Global Infrastructure

Lochay 132kv substation (new building)

We carried out all Internal Fit-out for new Lochay Substation incl: 

- Drylining/Joinery, MF suspended ceilings and Kitchen

- Fire Doors installation (incl. ironmongery)

- Painting/Spraying/Taping (incl. acid-resistant painting)

- Firestopping & Fireproofing

- etc.

Kelvin ERF (WTE) Substation cladding, roofing, M&E, Drylining, Joinery, tiling, painting by PKBC
Western Power - Acciona

Kelvin ERF (WTE) 44MW Substation

Kelvin is a Waste-To-Energy facility in Birmingham.  We undertook a Main Contract (Design & Build) for one of the buildings, incl:

- Design & Build

- System Scaffold, Brickworks and METSEC install

- Drylining/Joinery, MF suspended ceilings

- Steel external Fire doors

- M&E

- Plumbing

- Painting/Taping

- Roofing

- etc.

Beauly Substation - Joinery and Painting works by PKBC
SSEN - Global Infrastructure

Beauly 132kV Substation (old building)

We carried out a repair works at LIVE Beauly Substation (existing part), including:

- external steel Fire doors reveals stripping and replacement

- painting works

- additional works

- etc. 

PKBC Scaffolding , Blocklaying and Diamond Drill coring works on Glenglassaugh Destillery Warehouses
Brown Forman - LUDDON Construction

Glenglassaugh Distillery

We carried out works for whisky warehouse at Glenglassaugh Distillery including:

- over 1000m2 of System Scaffold installation

- over 1000m2 of concrete blockwalls

- painting of these walls

- floor line marking

- Diamond Core Drilling

- etc. 

PKBC Raised Access floor installation on Beatrice Blackhillock Substation. All Internal FitOut works
TINZ - RJ McLeod

Beatrice 400/200 kV Substation at Blackhillock

We carried out all Internal Fit-out for Beatrice Substation incl: 

- Blockworks

- Drylining/Joinery, Timber and MF suspended ceilings

- Fire Doors installation (incl. ironmongery)

- Painting/Spraying/Taping (incl. acid-resistant & anti-slip painting)

- Raised Access Floor (RAF)

- Firestopping & Fireproofing

- etc.

Copyright © 2025 PKBC Ltd - All Rights Reserved.

  • Privacy Policy

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept