PKBC Ltd
PKBC Ltd
  • Home
  • Services
    • Consultancy Services
    • Project Management
    • Bricklaying
    • Drylining
    • Joinery
    • Painting
    • Scaffolding
    • Firestopping
    • Chemical Resistant Floors
  • Gallery
  • Projects
    • Recents
    • Older
    • Projects Map
  • Vacancies
  • Contact Us
  • More
    • Home
    • Services
      • Consultancy Services
      • Project Management
      • Bricklaying
      • Drylining
      • Joinery
      • Painting
      • Scaffolding
      • Firestopping
      • Chemical Resistant Floors
    • Gallery
    • Projects
      • Recents
      • Older
      • Projects Map
    • Vacancies
    • Contact Us
  • Home
  • Services
    • Consultancy Services
    • Project Management
    • Bricklaying
    • Drylining
    • Joinery
    • Painting
    • Scaffolding
    • Firestopping
    • Chemical Resistant Floors
  • Gallery
  • Projects
    • Recents
    • Older
    • Projects Map
  • Vacancies
  • Contact Us
Welsh Power - RJ McLeod

Thurso Synchronous Condenser / Transmission 400kv Substation

Additional works at Thurso Synchronous Condenser Substation

- application of anti-slip floor paint to all floors

- additional works

- etc.

SSEN - Morgan Sindall

Gremista Grid Supply Point (gsp) 132kv substation (shetland)

We carried out all Internal Fitout works at Gremista Substation at Shetland, incl:

- System Scaffold installation

- Blockworks

- Drylining/Joinery, Timber and suspended grid ceilings, Kitchen

- Fire Doors installation (incl. ironmongery), 

- Painting/Spraying/Taping (incl. acid-resistant & anti-slip painting)

- etc.

Welsh Power - TSK/RJ McLeod

Gretna Grid stability plant/ 275kV Substation

We carried out requested works at Gretna GSP Substation, including:

- final grouting of external Fire wall

- Firestopping & Fireproofing

- etc.

SSEN - OMEXOM

Kintore 132kv Substation (Phase 3)

We carried out all Internal Fitout works at Phase 3 of Kintore Substation, incl:

- System Scaffold installation

- Blockworks

- Drylining/Joinery, Timber and suspended grid ceilings, Kitchen

- Fire Doors installation (incl. ironmongery), 

- Painting/Spraying/Taping

- Firestopping & Fireproofing

- etc.

Private Client

Biohacking Studio (Switzerland)

We carried out all internal fit-out at overseas  project (Biohacking Studio) in Switzerland. Works been carried :

- Drylining/Joinery

- Kitchen and furniture installation

- Doors installation

- Painting/Spraying/Taping

- Flooring

- etc.

Conrad Energy - ACS / Siemens Energy

Eye synchronous condenser Grid Stability Facility 400KV

We carried out an additional works at Eye Syn Con Substation , including:

- supply and installation of Fire doors

- painting works

- additional works

- etc. 

SSEN - Global Infrastructure

LOCHAY 132KV LIVE SUBSTATION (renovation of old BUILDING)

We carried out renovation works at old LIVE Lochay Substation incl:

- demolition works

- stripping and replacement of old high timber ceiling

- Painting/Taping (incl. acid-resistant painting)

- Fire Doors design and installation (incl. ironmongery)

- etc.

SSEN - Global Infrastructure

Lochay 132kv substation (new building)

We carried out all Internal Fit-out for new Lochay Substation incl: 

- Drylining/Joinery, MF suspended ceilings and Kitchen

- Fire Doors installation (incl. ironmongery)

- Painting/Spraying/Taping (incl. acid-resistant painting)

- Firestopping & Fireproofing

- etc.

Western Power - Acciona

Kelvin ERF (WTE) 44MW Substation

Kelvin is a Waste-To-Energy facility in Birmingham.  We undertook a Main Contract (Design & Build) for one of the buildings, incl:

- Design & Build

- System Scaffold, Brickworks and METSEC install

- Drylining/Joinery, MF suspended ceilings

- Steel external Fire doors

- M&E

- Plumbing

- Painting/Taping

- Roofing

- etc.

SSEN - Global Infrastructure

Beauly 132kV Substation (old building)

We carried out a repair works at LIVE Beauly Substation (existing part), including:

- external steel Fire doors reveals stripping and replacement

- painting works

- additional works

- etc. 

Brown Forman - LUDDON Construction

Glenglassaugh Distillery

We carried out works for whisky warehouse at Glenglassaugh Distillery including:

- over 1000m2 of System Scaffold installation

- over 1000m2 of concrete blockwalls

- painting of these walls

- floor line marking

- Diamond Core Drilling

- etc. 

TINZ - RJ McLeod

Beatrice 400/200 kV Substation at Blackhillock

We carried out all Internal Fit-out for Beatrice Substation incl: 

- Blockworks

- Drylining/Joinery, Timber and MF suspended ceilings

- Fire Doors installation (incl. ironmongery)

- Painting/Spraying/Taping (incl. acid-resistant & anti-slip painting)

- Raised Access Floor (RAF)

- Firestopping & Fireproofing

- etc.

Copyright © 2025 PKBC Ltd - All Rights Reserved.

  • Privacy Policy

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept